ENVI 3138: When is a Preconstruction Meeting to occur? Provide the section number and section title: Environmental Auditing Assignment, CBU, Canada

University Cape Breton University (CBU)
Subject ENVI 3138: Environmental Auditing

1. As per the Sydney Tar Ponds Agency Element TP6C Tender document in Moodle, please respond to the following:

  • When is a Preconstruction Meeting to occur? Provide the section number and section title.
  • What product does the contractor need to apply for dust control on the site? Provide the section number and section title.

2. An as-built drawing is a revised drawing submitted by a contractor upon completion of a construction project. These drawings contain any changes made from the initial drawings during the construction process.

  • In your opinion, why is it important that contractors are required to provide these as-built drawings after completion of a project?
  • Do you think that there needs to be a clause in the tender specifications to address as-built drawings?

3. Addenda captures revisions and modifications of key information during a tender and becomes part of the contract upon tender award. What items do you think could be included in an Addendum? Please specify three examples.